Primary Crusher and Control Cabin Replacement

Our diverse portfolio of projects

Location: Adelaide, South Australia

Industry: Quarrying

Plant upgrade of Primary Crusher with new operator’s hut

 

This project was a good example of QMM’s niche capability to perform upgrades of existing Brownfield sites.

The scope of work included:

  • Dismantling of access walkways around the existing primary Crusher
  • Removal of the old control cabin
  • Removal of the old Primary Crusher – 250T crane lift
  • Repairs carried out to Primary Crusher foundations
  • Installation of new mounts to suit the Crusher
  • New discharge chute for under Primary Crusher
  • Installation of the new Primary crusher – 250T crane lift
  • Installation of new operator’s hut with walkways to 4off sides
  • Various modifications to existing components

The project was completed on time working to a short shutdown period and without incident.